In Hamburg, a hook height of 105 metres was needed.
We first set up the tower crane to a height of 48 metres using a mobile crane. In the second stage, the crane rose to the final hook height. For this project, dismantlement could not be managed from a single location because of the curved shape and width of the building. Repositioning to a second location during the course of the project was unavoidable.