Brief Portraits

Emporio, Hamburg

Project period: 2009-2011
Services:
  • Construction machinery and equipment:
    • delivery and assembly of 30 ten-metre containers and 50 six-metre containers, incl. the utility connections
    • electrical site installation, including transformer stations
    • delivery and assembly of a 280 EC-H 12 Litronic, stand-alone
    • delivery and assembly of an MDT 222 and two MDT 162
  • Services:
    • construction site logistics coordination
    • construction site traffic management
    • storage space management
    • access control
    • surveillance provision of elevator operators
    • supply and disposal
    • winter road and pathway clearance
    • energy supply
Specialties:
  • The new building is being constructed next to the Unilever Tower, which is protected as a historic monument
  • To secure the stability of the stand-alone crane also without the connections to the building that are usual for such heights, various different thicknesses of tower components were combined, which became thinner with increasing height
  • Restricted space on the building site due to the inner city location

Landmark-Tower und Sockelgebäude, Bremen

Projektzeitraum: 2009-2010
Leistungen:
  • Rüstung und Schalung:
    • Lieferung von Schalung für Wände, Decken, Stützen und projektbezogene Kletterschalung für die Aufzugswände:
      • Framax Rahmenschalung
      • Streif-Stahlrundschalung (Stützenpfeiler)
      • Streif-KS Stützenschalung (für eckige Stützenpfeiler)
      • Streif-Flexdeckenschalung in Verbindung mit Filigrandeckenunterstützung
      • ID15 Schwerlasttürme für das Foyer in Verbindung mit einem Flexdeckensystem
      • System Skydeck mit Fallkopfsystem für die Deckenschalung
      • KG240 für die Aufzugswände an der Turmaußenseite (in Kombination mit AWS)
    • 82 laufende Meter Arbeits- und Wetterschutzeinhausung (AWS)
Besonderheiten:
  • Aufgrund der besonders spitzwinkligen Eckpunkte wurden Sonderteile an die Arbeits- und Wetterschutzelemente angebaut.
  • Auftraggeber nutzte den AWS für großflächige Werbeanbringungen

ThyssenKrupp-Quartier, Essen

Project period: 2007-2010
Services:
  • Construction machinery and equipment:
    • delivery and assembly of container for diverse construction participants
    • electrical site installation
  • Scaffolding and formwork:
    • 3.000 square metres of frame formwork
    • 3.950 square metres panel ceiling formwork
  • Services:
    • master planning construction logistics
    • access control
    • setting up a central logistics centre
    • safety and health coordination
    • coordination of construction logistics in fit-out
    • planning and coordination of furniture logistics and removal logistics
    • traffic management to and within the site
    • cleaning work within the course of moving in
    • energy supply
Specialties:
  • 230 hectares size, site located in inner city
  • participation of approx. twelve general contractors
  • sometimes up to 100 companies working on the construction site
  • one construction site approach road

Tower 185, Frankfurt

Project period: 2009-2011
Services:
  • Construction machinery and equipment:
    • delivery and assembly of seven luffing jibs: three Wolffkran 355 B, three Wolffkran 180 B, one 160 HC-L
    • delivery and assembly of 70 office and daytime accommodation containers
    • supply, maintenance and servicing of all electrical site equipment
    • provision of site utlilities
  • Scaffolding and formwork:
    • system formwork for straight walls and cores
    • Flex ceiling formwork
    • flexible circular formwork elements for curved walls
    • bearer beams and shaft platforms
    • various different support formwork and door system recesses
    • Proprietary SL-Light from TRINAC for parapets and walls to be erected later
    • use of hydraulic self-climbing formwork for core outer walls and perforated facade
  • Services:
    • energy supply
Specialties:
  • two Wolffkran 355 B will climb to a final height of 190m and will be anchored to the building using seven bracings

koelnmesse (Cologne Trade Fair) New Construction of the North trade fair hall, Cologne

Project period: 2004-2005
Services:
  • Construction machinery and equipment:
    • delivery and assembly of 5 revolving tower cranes:
      • 180 EC-H
      • 180 EC-H Litronic
      • 280 EC-H 12 Litronic
      • 280 EC-H
    • provision of 2 mobile cranes (Fuchs 118 m)
    • provision of 2 crawler cranes (HITACHI KH 125)
    • provision of 4 telescopic fork lift trucks (AVT 1330 SLT)
    • delivery and assembly of 260 containers
    • electrical site installation
  • Services:
    • energy supply

MaxCologne, Cologne

Project period: 2010-2012
Services:
  • Construction machinery and equipment:
    • delivery and assembly of 3 revolving tower cranes: two LH 180 EC-H10li and one LH 280 EC-H12li
    • provision of containers (daytime accommodation, store and access container)
    • electrical site installation
  • Scaffolding and formwork:
    • 200 square metres SL-Light from TRINAC frame formwork
  • Services:
    • Safety and health coordination
    • site power
Specialties:
  • LH 280 EC-H12li is set up on the existing tower because of restricted space conditions. Because it is close to Cologne-Bonn Airport and a helicopter landing place at the trade fair in Cologne-Deutz, a permit under aviation law was necessary for this crane location.

Süddeutscher Verlag, Munich

Project period: 2006-2008
Services:
  • Construction machinery and equipment:
    • delivery and assembly of 5 revolving tower cranes (tower 131.6 metres, respectively 120.3 metres with building bracing)
    • delivery and assembly of 64 office containers
    • 1 access container with barrier
    • electrical site installation incl. connection of the container systems and lighting
  • Scaffolding and formwork:
    • delivery of formwork for approx. 125,000 sqm of area to be lined
    • approximately 150 running metres of fall and weather protection elements for the tower
  • Services:
    • access control
    • setting up central control station
    • access management with scheduled deliveries and collections
    • floor management
    • construction site supervision and surveillance
    • work safety
    • supply and waste disposal logistics
    • daily waste disposal and rough cleaning of construction site
    • coordination site elevator times and cranes
Specialties:
  • Site located in inner city
  • Up to 100 subcontractors simultaneously on the construction site
  • Two construction site access roads
  • Very restricted construction site

Office and administration building of  GNS, Essen

Project period: 2009-2011
Services:
  • Construction machinery and equipment:
    • delivery and assembly of three revolving tower cranes: two MDT 178 and one LH 140 EC-H li
    • delivery and assembly of a container system consisting of approximately 20 modules
    • electrical site installation
  • Scaffolding and formwork:
    • 450 square metres SL-Light from TRINAC formwork for the foundations
    • 800 square metres support formwork and 1,080 square metres of steel framework for the walls
    • 4.000 square metres of Flex formwork and 1,400 square metres of panel floor/ceiling formwork
  • Services:
    • safety and health coordination
    • access control

Weser Tower, Bremen

Project period: 2008-2009
Services:
  • Construction machinery and equipment:
    • delivery and assembly of a Liebherr EC-H Litronic
  • Scaffolding and formwork:
    • delivery of formwork for steel-reinforced concrete work and scaffolding systems:
      • 350 square metres of steel frame formwork
      • 500 square metres special formwork for exposed concrete SB3
      • 1.500 square metres of panel floor/ceiling formwork
      • square column formwork, round steel column systems, two crane-displaceable climbing frame units with necessary moving base platforms
    • 110 running metres of work and weather protection enclosure
Specialties:
  • Crane measuring 98 metres was set up as a stand-alone unit

Grand Mall, Varna

Project period: 2009-2010
Services:
  • Construction machinery and equipment:
    • delivery and assembly of 7 revolving tower cranes
    • two 120-metre elevators

Acropolis, Athens

Project period: 2007
Services:
  • Delivery of 2 revolving tower cranes
Specialities:
  • The two revolving tower cranes were used to transport more than 300 antique statues and sculptures as well as another 4,000 antique artifacts from the world-famous Acropolis rock to the new history museum in the valley. The exhibits were packed into steel containers and moved using the cranes prepared on the hill

Vienna Skylink, Vienna

Project period: 2005-2009
Services:
  • Construction machinery and equipment:
    • delivery, assembly and management of three container villages (office, team and sanitary containers):
      • 111 three-storey containers
      • 90 three-storey containers
      • 66 three-storey containers
      • incl. all additional work, such as building the foundations, connecting water and waste water, disposal and separation of any refuge, the managing the accommodations, supervision of the house regulations and daily cleaning
    • 20 store containers
    • delivery of 2 180 EC-H revolving tower cranes
    • electrical site installation:
      • four 1000V transformer stations
      • almost 9 km of cables
      • more than 100 distribution cabinets
    • telescopic fork lift trucks
Specialities:
  • Stringent security regulations at the airport
  • Relocation of the container villages during ongoing operations because of construction work progress
  • Several conversion of the electrical installations to keep pace with construction work progress

Office building Rondo 1, Warsaw

Project period: 2003-2005
Services:
  • Construction machinery and equipment:
    • delivery, assembly and maintenance of 2 revolving tower cranes
Specialities:
  • the highest crane was raised to over 200 metres

Multi-function complex Zlote Tarasy, Warsaw

Project period: 2003-2005
Services:
  • Construction machinery and equipment:
    • delivery, assembly and maintenance of 10 different configurations of revolving tower cranes
Specialties:
  • At the time the construction site of the building complex was one of the biggest in Europe; to prevent the cranes colliding, all top slewing cranes were fitted with the “Top-Tracing” system

Shopping and leisure centre Galeria Malta, Posen

Project period: 2007-2008
Services:
  • Construction machinery and equipment:
    • delivery, assembly and maintenance of 8 revolving tower cranes

Multi-function complex Sky Tower, Breslau

Project period: 2008-2012
Services:
  • Construction machinery and equipment:
    • delivery, assembly and maintenance of 5 revolving tower cranes
Specialties:
  • The Sky Tower is 258 metres tall, making it the highest building in Poland. Consequently the highest crane climbs to a height of 260 metres

Barwa Commercial Avenue, Qatar

Project period: 2008-2009
Services:
  • Scaffolding and formwork:
    • sale of a total of approximately 5,000 square metres of wall and pillar formwork of the brand SL-Light from TRINAC (steel version) and Telos from TRINAC
    • 20,000 square metres of beam and ceiling formwork from our partner companies Faresin and Pafili
    • Local on-site services:
      • provision of assembly foremen, coordination and supervision of the initial formwork assembly, training employees how to handle formwork
Specialities:
  • Development of a shuttle carriage for propping platforms which enables whole components to be moved
  • Development of a pre-assembled stair formwork system which enables pre-assembly of stairs and landings in one piece on site
  • Transport of approximately 2,000 tonnes of material in 100 sea containers to Doha

North Gate Mall, Doha, Qatar

Project period: 2011-2014
Services:
  • Leasing 8 revolving tower cranes
  • Assembly and disassembly
  • Crane operators
  • Crane service during operations

Sheraton Car Park, Doha, Qatar

Project period: 2011-2012
Services:
  • Leasing 2 revolving tower cranes
  • Assembly and disassembly
  • Crane service during operations

Residential buildings Schorsa, Kiew

Project period: 2007
Services:
  • Construction machinery and equipment:
    • delivery and assembly of 3 revolving tower cranes

Residential buildings, Moscow

Project period: 2010-2011
Services:
  • Construction machinery and equipment:
    • delivery and assembly of a Liebherr 550 EC-H 40 revolving tower crane, fitted free-standing at a height of 84 metres
Specialities:
  • The LH 550 EC-H 40 was the first of this type of Liebherr crane to be set up in Russia
Deutschland

Emporio, Hamburg

Project period: 2009-2011
Services:
  • Construction machinery and equipment:
    • delivery and assembly of 30 ten-metre containers and 50 six-metre containers, incl. the utility connections
    • electrical site installation, including transformer stations
    • delivery and assembly of a 280 EC-H 12 Litronic, stand-alone
    • delivery and assembly of an MDT 222 and two MDT 162
  • Services:
    • construction site logistics coordination
    • construction site traffic management
    • storage space management
    • access control
    • surveillance provision of elevator operators
    • supply and disposal
    • winter road and pathway clearance
    • energy supply
Specialties:
  • The new building is being constructed next to the Unilever Tower, which is protected as a historic monument
  • To secure the stability of the stand-alone crane also without the connections to the building that are usual for such heights, various different thicknesses of tower components were combined, which became thinner with increasing height
  • Restricted space on the building site due to the inner city location

Landmark-Tower und Sockelgebäude, Bremen

Projektzeitraum: 2009-2010
Leistungen:
  • Rüstung und Schalung:
    • Lieferung von Schalung für Wände, Decken, Stützen und projektbezogene Kletterschalung für die Aufzugswände:
      • Framax Rahmenschalung
      • Streif-Stahlrundschalung (Stützenpfeiler)
      • Streif-KS Stützenschalung (für eckige Stützenpfeiler)
      • Streif-Flexdeckenschalung in Verbindung mit Filigrandeckenunterstützung
      • ID15 Schwerlasttürme für das Foyer in Verbindung mit einem Flexdeckensystem
      • System Skydeck mit Fallkopfsystem für die Deckenschalung
      • KG240 für die Aufzugswände an der Turmaußenseite (in Kombination mit AWS)
    • 82 laufende Meter Arbeits- und Wetterschutzeinhausung (AWS)
Besonderheiten:
  • Aufgrund der besonders spitzwinkligen Eckpunkte wurden Sonderteile an die Arbeits- und Wetterschutzelemente angebaut.
  • Auftraggeber nutzte den AWS für großflächige Werbeanbringungen

ThyssenKrupp-Quartier, Essen

Project period: 2007-2010
Services:
  • Construction machinery and equipment:
    • delivery and assembly of container for diverse construction participants
    • electrical site installation
  • Scaffolding and formwork:
    • 3.000 square metres of frame formwork
    • 3.950 square metres panel ceiling formwork
  • Services:
    • master planning construction logistics
    • access control
    • setting up a central logistics centre
    • safety and health coordination
    • coordination of construction logistics in fit-out
    • planning and coordination of furniture logistics and removal logistics
    • traffic management to and within the site
    • cleaning work within the course of moving in
    • energy supply
Specialties:
  • 230 hectares size, site located in inner city
  • participation of approx. twelve general contractors
  • sometimes up to 100 companies working on the construction site
  • one construction site approach road

Tower 185, Frankfurt

Project period: 2009-2011
Services:
  • Construction machinery and equipment:
    • delivery and assembly of seven luffing jibs: three Wolffkran 355 B, three Wolffkran 180 B, one 160 HC-L
    • delivery and assembly of 70 office and daytime accommodation containers
    • supply, maintenance and servicing of all electrical site equipment
    • provision of site utlilities
  • Scaffolding and formwork:
    • system formwork for straight walls and cores
    • Flex ceiling formwork
    • flexible circular formwork elements for curved walls
    • bearer beams and shaft platforms
    • various different support formwork and door system recesses
    • Proprietary SL-Light from TRINAC for parapets and walls to be erected later
    • use of hydraulic self-climbing formwork for core outer walls and perforated facade
  • Services:
    • energy supply
Specialties:
  • two Wolffkran 355 B will climb to a final height of 190m and will be anchored to the building using seven bracings

koelnmesse (Cologne Trade Fair) New Construction of the North trade fair hall, Cologne

Project period: 2004-2005
Services:
  • Construction machinery and equipment:
    • delivery and assembly of 5 revolving tower cranes:
      • 180 EC-H
      • 180 EC-H Litronic
      • 280 EC-H 12 Litronic
      • 280 EC-H
    • provision of 2 mobile cranes (Fuchs 118 m)
    • provision of 2 crawler cranes (HITACHI KH 125)
    • provision of 4 telescopic fork lift trucks (AVT 1330 SLT)
    • delivery and assembly of 260 containers
    • electrical site installation
  • Services:
    • energy supply

MaxCologne, Cologne

Project period: 2010-2012
Services:
  • Construction machinery and equipment:
    • delivery and assembly of 3 revolving tower cranes: two LH 180 EC-H10li and one LH 280 EC-H12li
    • provision of containers (daytime accommodation, store and access container)
    • electrical site installation
  • Scaffolding and formwork:
    • 200 square metres SL-Light from TRINAC frame formwork
  • Services:
    • Safety and health coordination
    • site power
Specialties:
  • LH 280 EC-H12li is set up on the existing tower because of restricted space conditions. Because it is close to Cologne-Bonn Airport and a helicopter landing place at the trade fair in Cologne-Deutz, a permit under aviation law was necessary for this crane location.

Süddeutscher Verlag, Munich

Project period: 2006-2008
Services:
  • Construction machinery and equipment:
    • delivery and assembly of 5 revolving tower cranes (tower 131.6 metres, respectively 120.3 metres with building bracing)
    • delivery and assembly of 64 office containers
    • 1 access container with barrier
    • electrical site installation incl. connection of the container systems and lighting
  • Scaffolding and formwork:
    • delivery of formwork for approx. 125,000 sqm of area to be lined
    • approximately 150 running metres of fall and weather protection elements for the tower
  • Services:
    • access control
    • setting up central control station
    • access management with scheduled deliveries and collections
    • floor management
    • construction site supervision and surveillance
    • work safety
    • supply and waste disposal logistics
    • daily waste disposal and rough cleaning of construction site
    • coordination site elevator times and cranes
Specialties:
  • Site located in inner city
  • Up to 100 subcontractors simultaneously on the construction site
  • Two construction site access roads
  • Very restricted construction site

Office and administration building of  GNS, Essen

Project period: 2009-2011
Services:
  • Construction machinery and equipment:
    • delivery and assembly of three revolving tower cranes: two MDT 178 and one LH 140 EC-H li
    • delivery and assembly of a container system consisting of approximately 20 modules
    • electrical site installation
  • Scaffolding and formwork:
    • 450 square metres SL-Light from TRINAC formwork for the foundations
    • 800 square metres support formwork and 1,080 square metres of steel framework for the walls
    • 4.000 square metres of Flex formwork and 1,400 square metres of panel floor/ceiling formwork
  • Services:
    • safety and health coordination
    • access control

Weser Tower, Bremen

Project period: 2008-2009
Services:
  • Construction machinery and equipment:
    • delivery and assembly of a Liebherr EC-H Litronic
  • Scaffolding and formwork:
    • delivery of formwork for steel-reinforced concrete work and scaffolding systems:
      • 350 square metres of steel frame formwork
      • 500 square metres special formwork for exposed concrete SB3
      • 1.500 square metres of panel floor/ceiling formwork
      • square column formwork, round steel column systems, two crane-displaceable climbing frame units with necessary moving base platforms
    • 110 running metres of work and weather protection enclosure
Specialties:
  • Crane measuring 98 metres was set up as a stand-alone unit
Bulgarien

Grand Mall, Varna

Project period: 2009-2010
Services:
  • Construction machinery and equipment:
    • delivery and assembly of 7 revolving tower cranes
    • two 120-metre elevators
Griechenland

Acropolis, Athens

Project period: 2007
Services:
  • Delivery of 2 revolving tower cranes
Specialities:
  • The two revolving tower cranes were used to transport more than 300 antique statues and sculptures as well as another 4,000 antique artifacts from the world-famous Acropolis rock to the new history museum in the valley. The exhibits were packed into steel containers and moved using the cranes prepared on the hill
Österreich

Vienna Skylink, Vienna

Project period: 2005-2009
Services:
  • Construction machinery and equipment:
    • delivery, assembly and management of three container villages (office, team and sanitary containers):
      • 111 three-storey containers
      • 90 three-storey containers
      • 66 three-storey containers
      • incl. all additional work, such as building the foundations, connecting water and waste water, disposal and separation of any refuge, the managing the accommodations, supervision of the house regulations and daily cleaning
    • 20 store containers
    • delivery of 2 180 EC-H revolving tower cranes
    • electrical site installation:
      • four 1000V transformer stations
      • almost 9 km of cables
      • more than 100 distribution cabinets
    • telescopic fork lift trucks
Specialities:
  • Stringent security regulations at the airport
  • Relocation of the container villages during ongoing operations because of construction work progress
  • Several conversion of the electrical installations to keep pace with construction work progress

Polen

Office building Rondo 1, Warsaw

Project period: 2003-2005
Services:
  • Construction machinery and equipment:
    • delivery, assembly and maintenance of 2 revolving tower cranes
Specialities:
  • the highest crane was raised to over 200 metres

Multi-function complex Zlote Tarasy, Warsaw

Project period: 2003-2005
Services:
  • Construction machinery and equipment:
    • delivery, assembly and maintenance of 10 different configurations of revolving tower cranes
Specialties:
  • At the time the construction site of the building complex was one of the biggest in Europe; to prevent the cranes colliding, all top slewing cranes were fitted with the “Top-Tracing” system

Shopping and leisure centre Galeria Malta, Posen

Project period: 2007-2008
Services:
  • Construction machinery and equipment:
    • delivery, assembly and maintenance of 8 revolving tower cranes

Multi-function complex Sky Tower, Breslau

Project period: 2008-2012
Services:
  • Construction machinery and equipment:
    • delivery, assembly and maintenance of 5 revolving tower cranes
Specialties:
  • The Sky Tower is 258 metres tall, making it the highest building in Poland. Consequently the highest crane climbs to a height of 260 metres
Qatar

Barwa Commercial Avenue, Qatar

Project period: 2008-2009
Services:
  • Scaffolding and formwork:
    • sale of a total of approximately 5,000 square metres of wall and pillar formwork of the brand SL-Light from TRINAC (steel version) and Telos from TRINAC
    • 20,000 square metres of beam and ceiling formwork from our partner companies Faresin and Pafili
    • Local on-site services:
      • provision of assembly foremen, coordination and supervision of the initial formwork assembly, training employees how to handle formwork
Specialities:
  • Development of a shuttle carriage for propping platforms which enables whole components to be moved
  • Development of a pre-assembled stair formwork system which enables pre-assembly of stairs and landings in one piece on site
  • Transport of approximately 2,000 tonnes of material in 100 sea containers to Doha

North Gate Mall, Doha, Qatar

Project period: 2011-2014
Services:
  • Leasing 8 revolving tower cranes
  • Assembly and disassembly
  • Crane operators
  • Crane service during operations

Sheraton Car Park, Doha, Qatar

Project period: 2011-2012
Services:
  • Leasing 2 revolving tower cranes
  • Assembly and disassembly
  • Crane service during operations
Ukraine

Residential buildings Schorsa, Kiew

Project period: 2007
Services:
  • Construction machinery and equipment:
    • delivery and assembly of 3 revolving tower cranes
Russland

Residential buildings, Moscow

Project period: 2010-2011
Services:
  • Construction machinery and equipment:
    • delivery and assembly of a Liebherr 550 EC-H 40 revolving tower crane, fitted free-standing at a height of 84 metres
Specialities:
  • The LH 550 EC-H 40 was the first of this type of Liebherr crane to be set up in Russia